Skip to main content
Back to blog

Specifying Inspection Documents for Machined Parts

KYT

Optical dimensional measuring equipment in the KYT workshop.
Dimensional measuring equipment in the KYT workshop.

Describe the inspection documents you need in the quote request. State which parts and drawing requirements the records must cover, when acceptance is assessed and which documents must accompany the shipment. Confirm availability and scope with the supplier before ordering.

Identify the order and drawing package

Give the part number, drawing revision and order reference to appear on the records. For an assembly or a set of parts, identify the items separately and specify how their records must be linked.

State the quantity to be inspected and how the inspected parts should be identified. If a sample or first-piece approval is required before the rest of the order proceeds, identify the approval stage, required records and person authorized to approve it.

Mark the features to be reported using a numbered drawing or another agreed reference. Specify the information the dimensional record must show, including:

  • The part and revision being checked.
  • The drawing feature or requirement reference.
  • The required value, units and acceptance limits.
  • The measured result and identification of the inspected part or sample.
  • Any required measurement-method information and the outcome against the agreed criteria.

Confirm the reporting format before ordering, especially if the records must fit your own approval process. Identify relationships between features that need checking, as well as individual dimensions.

State the condition used for acceptance

Specify whether a requirement applies before finishing, after finishing or in the assembled condition. For a part with several operations, identify the stage covered by each required record.

For an aluminum housing, mark the visible faces and state how their appearance is approved. If approval uses a sample, color reference or inspection instruction, identify that reference and link it to the drawing revision. Define any separate requirement for dimensional acceptance.

Request material and test documents separately

State which material documents are required and how they must identify the supplied parts or batch. Ask the supplier to confirm the document type, availability and any limits to the information supplied. Include these requirements in the quotation.

For tests, provide the method, conditions, acceptance criteria and records required. A tee fitting may have a project-specific leak or cleanliness requirement; the request must define what is to be tested and what counts as acceptance.

For a heat-sink profile, identify which dimensions must be reported and who is responsible for validating the thermal result in the final assembly. Keep each required test connected to its defined scope and responsible party.

Agree how exceptions are reviewed

Identify the person who can approve a proposed change or a reported deviation. State what information must be submitted for review, how a decision is recorded and which parts or order quantities it covers.

If a change is accepted, identify the drawing revision or written approval that controls the affected order. Confirm any revised inspection or identification requirements with that approval.

Example: an inspection-document request

Please include a dimensional record linked to the feature references in the attached drawing. Identify the part revision and inspected items. The inspection request defines the quantity, acceptance state and required material documents. Confirm the proposed report format and document availability with the quotation. Submit any deviation for written review by the named technical contact before proceeding with the affected parts.

Use the inspection requirements page to check the scope, appearance and packing information alongside the documents. Send the drawing and inspection request together so the required deliverables can be confirmed in the quote.